You could spend thousands of dollars fixing a material spill. You can prevent it with a DAZIC® Zero Speed Switch.
Since 1951, both industry leaders and SMEs have trusted DAZIC to prevent material spills that cause downtime and accidents. Even one minute of lost productivity can cost thousands of times more than the price of a single speed switch.
We work with some of the world’s largest cement companies, as well as SMEs and local businesses.
DAZIC prevents material pileups by stopping machine operations when it deviates from normal speed parameters. It can detect changes in motion from .5 RPM up to 2000 RPM. Get the full FAQs on speed switches, or watch the video.
Clearing tons of spilled mined materials like heavy rocks can take several days
Injuries from being hit by materials or cleaning it causes medical and even legal costs
Comply with strict industry standards for worker and equipment safety
Models available for hazardous environments
Companies saved time and money and got better results after switching to DAZIC
READ FULL CASE STUDYCopyright Control Concepts, Inc. , 19 S. Main Street, Brooklyn, CT 06234 • ph: 860-928-6551 • fax: 860-928-9450