Steven, Cemex plants have switched to AirSweep because it gives better flow at lower cost.
AirSweep was installed in your plants in the following regions:
Get proven technology and reliable results.
IT TOOK AIRSWEEP JUST 4 DAYS TO SOLVE A PROBLEMREAD THE CASE STUDY
THAT PLAGUED THE COMPANY FOR YEARS.
A cement company in Asia lost $12,000 for every hour of downtime.
They tried air knockers and vibration motors, but only AirSweep gave real results.
AirSweep cleared all build-up,
and helped achieve the target
flow rate of 25-30 tons an hour.
AirSweep used half the electricity
of other flow aids. This already
gave a high return of investment
because of the high cost per
KWH.
Both installation and testing of
the AirSweep took less than 8
hours, with the remaining time
spent on air piping and headers.
See why AirSweep gives better results at a lower cost
Steven, thank you for choosing AirSweep. Fill out the email form to get in contact with our sales team.
Copyright Control Concepts, Inc. 2020, 19 S. Main Street, Brooklyn, CT 06234 • ph: 860-928-6551 • fax: 860-928-9450