Steven, Cemex plants have switched to AirSweep because it gives better flow at lower cost.
AirSweep was installed in your plants in the following regions:
Get proven technology and reliable results.
IT TOOK AIRSWEEP JUST 4 DAYS TO SOLVE A PROBLEMREAD THE CASE STUDY
THAT PLAGUED THE COMPANY FOR YEARS.
A cement company in Asia lost $12,000 for every hour of downtime.
They tried air knockers and vibration motors, but only AirSweep gave real results.
AirSweep cleared all build-up, and helped achieve the target flow rate of 25-30 tons an hour.
AirSweep used half the electricity of other flow aids. This already gave a high return of investment because of the high cost per KWH.
Both installation and testing of the AirSweep took less than 8 hours, with the remaining time spent on air piping and headers.
See why AirSweep gives better results at a lower cost
Steven, thank you for choosing AirSweep. Fill out the email form to get in contact with our sales team.
Copyright Control Concepts, Inc. , 19 S. Main Street, Brooklyn, CT 06234 • ph: 860-928-6551 • fax: 860-928-9450